Showing posts with label people. Show all posts
Showing posts with label people. Show all posts

Sunday, March 30, 2008

Doing what has to be done

Yesterday I spotted this rig.












This rig is an accident waiting to happen. Besides having a trailer to heavy for the mini-van, the mini-van is front wheel drive, and this rig was being pulled by an old lady (looked to be 80) that could barely walk. She was trying to keep the safety chains from dragging when I first spotted her.

I didn't get to see plates on the mini-van, so I have no idea how far she had already traveled but she entered I-30 heading west. The hitch was near the ground just sitting still. It has to hit the ground when bouncing down the interstate.

We all "do what we have to do", but I hope the u-haul people at least informed her that this would be very unsafe.

Hopefully she makes it without incident.

Friday, March 07, 2008

Ratings

From the seat of my truck I have a nice view inside the vehicles that pass. Though the years I have watched the "little movies" (only recorded in my mind) that appear in my drivers door window.

These little clips can last a few seconds to just a quick blink, depending on how fast the vehicle is passed by. City stop and go traffic can produce longer versions of these little movies. Just like the movies at the theater, mine can be rated as G, PG13, R, X, and even XXX.

After dark when I see a vehicle with the interior light on, I usually see someone eating, reading, or selecting a compact disc.

All this looking is just not voyeurism but also a safety issue, as a car passes the air disturbance caused by my large truck can suck the passing car toward my truck ( that's my story and I am sticking to it).

Wednesday night as I was driving from from Texarkana, I noticed a car approaching and as it reached my side window, the interior light came on. The car contained two college aged girls and the the passenger put on a little show for me, I was obligated to look (can you imagine the years of therapy she would have to endure if she couldn't get an old trucker to look) and after a few seconds they both waved and off they went after turning off their interior light.

So, how did I rate the show? Differently a "D" and quite possibly "DD's", hehe.

Sunday, January 20, 2008

See ya down the road

I met another backpacker this week but he was not what I would consider your usual (if there is such a thing) vagabond.

He had his backpack off and taking a break near our yard on hwy82 west of Texarkana, Tx. He asked that I not take any pictures and we had a short chat.

He was eager to talk but was hesitant to give real details. He appeared to be in his late 40's or early 50's. When I asked where he was from he just answered "all over" and then his destination was "just heading down the road".

His clothes were clean and he was clean shaven and his back pack looked fairly new.















His setup was similar to the one above and he was carrying a tent and ground pad. He appeared to be equipped for backpack traveling.

I just wondered if he was "running away" and had not made it far enough from home to give any personal information. Maybe he was just wanting to leave for awhile or perhaps attempting to make a fresh start down the road. Maybe he was just off for a weekend (it was Friday afternoon) hike, but it was one of you coldest (in the low 30's) days this year.

He was very intriguing but I just could not get him to open up. I would like to meet him a month or two down the road and hear his story.

Friday, November 30, 2007

I love it!

As you know, I seek out the "characters" in life and genuinely enjoy the encounters with these people. People that fit in the mold of everyday life hold very little entertainment value. Heck, I might as well just look in the mirror if I seek a plain vanilla person.

One of the blogs I regularly read is "Randy and Diana" and Randy also loves eccentrics and often writes about them (hmmm, does that sound familiar?).

Here, Randy gets the story is his latest. Homeless doesn't seem so bad to this guy, because I am sure he doesn't consider himself "homeless" and I would have to agree with him.

Monday, November 26, 2007

Homeless

Saturday on my way to work as I exited the frontage road for my 3 mile use of the interstate, I noticed a bicyclist pulling a trailer I would have passed had I stayed on the frontage road. I pulled off the interstate and waited for him to reach me, expecting once more to talk to a touring biker.

"Steve" stopped and we talked a few minutes. I didn't ask his age but I would guess him to be at or near retirement (62years) age. He was riding an older mountain bike (its make hidden by what appeared to be several repaints) and pulling a modified child type two wheel trailer. I had a hard time reading him and his setup. Either he had been doing this for some time or had bought a used mountain bike with a few added features. All the extras were as used as the bike and I can only assume they were added when the bike was new.

The weather was just above freezing and Steve was wrapped up for it. He said he had spent Thursday night in a homeless shelter in Little Rock and headed south and spent Friday night in a church in Benton (20 miles southwest). The Benton police had told him that rain (maybe sleet) was forecast for the next 2 days so he had decided to head back to Little Rock.

I usually ask more questions but Steve seemed "homeless" and just had a bike to carry his possessions. The last thing I wanted to do was embarrass him. He could have been a traveling homeless person or from Little Rock, either way he was doing the best he could do. Several things did point to him as being a roadie. He was wearing a helmet and his trailer had a "caution, slow moving vehicle triangle" on it.

I wished I could have invited him into the nearby convenient store for a hot coffee and more conversation but I was running late (as usual). He said he was wanting to head south after the rains and I explained the best way out of town.

If indeed he were homeless and traveling, then he was rather ingenious because most police will not bother a touring bicyclist that is camping out except to tell them that camping is not permitted in their jurisdiction and ask them to move on. The public will offer to help where they would turn up their noses at a homeless person.

When I gave Steve some money I did not want it to look like a handout so I said, "Steve, I ride a bike and would someday like to hit the road for a trip, so please let me buy you a warm meal". He thanks me and we parted ways.

Homelessness in America is a big problem and just to get by on SS takes more creativeness, but I am not so naive as to think when I help someone it is about "them", helping strokes ones own ego and we all like be feel better about ourselves. I pick and choice and it does feel good to think you have helped someone that needs it as opposed to someone only there for a handout.

Sunday, November 18, 2007

c2c

"c2c", what on earth could that stand for? Well, "c2c" stands for "Coast to Coast" or "Sea to Sea", meaning a trip across America. These are terms used by bicyclist (among others) to identify the epic adventure in terms of traveling across America.

This idea first became popular (due to media coverage) in 1976 because of the 4000 bicyclists that cycled across America to celebrate the bicentennial of America. From this event the Adventure Cycling Association was formed and the rest is cycling history.

Cyclist now just refer to the trip as "going across".

Adventure Cycling Association sells detailed maps of several routes including a map of the original bicentennial route,
















also the northern route,
















and southern tier.

















In the past I have written about John and Jerry
but Friday was the first cyclist I have met that was "going across".













Bryan was not using the bike maps but was playing it by ear and using a small road atlas for general directions. I met him on highway US64 that parallels I-40 across Arkansas, just to the south of I-40 from the western edge of the state until Conway (nearly in the center of the state) and then north of I-40 (moving farther north of the Interstate) for the remaining route to the eastern side of the state. Most of this road has a nice wide shoulder to ride on.

Bryan had been on the road about 45 days since leaving Oregon and mostly camping with a few motel nights mixed in, he was in no hurry and just heading east to the Atlantic Ocean. He works as a campground maintenance man and his campground was closed for the winter. He had plans to head south and hit US82 and follow it east. Again his bike was not the traditional touring bike but part of his equipment was top notch. Any bike in decent shape can be used for touring but a traditional touring bike is designed to carry the load and be comfortable mile after mile. His Ortlieb bags (panniers) are some of the most popular used by touring cyclist. His tire pump was another thing altogether. He was carrying a "floor type" tire pump.







While they do an excellent job, they are a little heavy compared to







this small and easily carried model.

Since Little Rock and crossing the Arkansas River can be a challenge, I helped him devise a plan to stay on US64 past Little Rock and showed him the route I thought (again, not always the same on a bike as in a car) would be best for him as he headed south to US82, mindful that crossing the Mississippi River can also be a challenge on a bike.

Bicycling across America would be physically challenging but the mental challenge would be even greater. As a teenager I hitchhiked all over the west and as a man I have taken many motorcycle trips but when on a bicycle you are hours away from changing what ever situation you find yourself in.

Tuesday, October 30, 2007

Bus Conversion

As a rver, I always notice rvs on the road. Most are "run of the mill" factory built units. When I see an unsual rv I take special notice.

I met Mel from Peoria, Il. at a rest area and struck up a conversation with him (image that!). He and his wife were headed to "the valley" in Texas for the winter. They spend their winters in the Brownville area and their summers at home in Peoria.

Their rv is a conversion on a 1962 GMC Greyhound bus. Not one of the "high dollar" factory rigs but an owner built unit with all the comforts of home. It was already converted when they purchased it 7 years ago but has been remodeled by Mel to better suit their needs.















The bus has apartment size appliances instead of the usual rv size units. Their Danby refrigerator (very energy efficient) runs off an inverter powered by six 6 volt golf car batteries when on the road and the inverter switches to a battery charger when hooked to shore power (regular electricity from a light pole) or plugged into their onboard generator.

I would have visited longer but I had over 400 miles to cover before my day could end.

Thursday, September 20, 2007

Talk is Cheap

He passed me in his Ford F-250 with a temporary tax showing he had purchased the used truck that very day.

When I pulled into the rest area just east of Texarkana, I noticed him getting out of his truck. Before he could walk the 150 ft to the vending machines, he had turned to look at his truck no less than 4 times. He was obviously very proud of it.

As I headed to the restroom, he was coming back to his truck (never taking his eyes off of it). I stopped him and asked about his truck (knowing he would like to talk about it).

His father and brothers both had diesel pickups but this was his first. It was a 2000 model that he would use to drive to work and pull a small horse trailer. After I bragged on his purchase, he was off to show his wife.

Upon returning from the restroom, I noticed a small car pulling up with its gas cap dangling. As I approached the driver, he was rambling in the glove compartment. He noticed me and rolled down his window and said, "Good afternoon young man". Yes, he was older than me (getting harder to find every day).

When I told him about the gas cap and the fact that it would cause the "check engine" light to come on, he laughed and said, "Heck, I knew that but would you believe I was just looking for the phone number of the rental car agency because the "check engine" light had just came on". He thanked me for saving him an embarrassing phone call and we both had a good laugh.

I love to talk to people and "talk is cheap". Cheap, heck it's free.

Tuesday, August 07, 2007

Canada bound update

I have received three e-mails from Jerry the biker. His last stated he had to cut his journey short because of a doctors appointment ( he had mentioned his medical history to me) that he thought could be rescheduled but couldn't.

He had made it to Lexington, Ky. and had biked over 1000 miles. He was disappointed about having to stop but looking forward to completing his adventure at a later date.

I will be traveling in that part of the country next week as I am helping Zac move to Penn State and Judy and I will just make a vacation out of it.

It will be our first trip in our new truck. Oh, haven't told you about that. Another day another post.

Monday, July 23, 2007

Canada Bound

While driving on the frontage road today, I passed a touring bicyclist. I drove passed him far enough I could stop and walk back to meet him.



"Jerry" lived in Dallas, Texas and was on his way to Canada. He had ridden Interstate 30 most of the way from Dallas. Both illegal and dangerous. He would use the frontage road when one was available.



He was not sure how he was going to get across Little Rock but said he was headed toward Memphis, Tn.. With no frontage roads for most of the way across Little Rock, I asked if he would accept a ride. Some tour cyclist want to "pedal" every mile, but he accepted and we loaded his bike in my pickup.



I assured him that he would be better off riding US70, a 2-lane highway with a nice shoulder most of the time, that runs parallel to I-30. Since I don't have a set time to be at work, I drove him the 15 or so miles to put him on US70 a few miles out of town.



He was not riding a conventional touring bike (like the one below) that lets you spread your load front and rear on the bike.


















He was on a Mongoose mountain bike from WalMart. All the weight was on the rear of this "heavy" low-end bike. He was not wearing a helmet nor was he wearing gloves.
















I took this picture where I let him off on US70. He gave me a card with his name and e-mail address so I could e-mail him my blog site and he promised I would get the first e-mailed picture when he makes it to Canada.

I wished him well (wishing he was better prepared) and he was off.

ps. I just received an e-mail from Jerry and he made it to Forrest City about 8pm. I let him off around 11am. He had traveled about 90 miles this afternoon. Way to go, Jerry.

Saturday, July 21, 2007

Aussie


Today I met Mark, he is from Australia and over here working on a visa. He drives a truck for CalArk trucking in Little Rock, Arkansas.


He saw an ad in a newspaper for driving a "lorrie" (their term for a 18wheeler) in America. The agency that placed the ad in the newspaper wanted a large premium for placing him with a company in the US.


He went "online" and found several ads and sent in inquiries, CalArk was the only one that responded.
His visa has run out but he has applied for an extension. The government has 240 days to reply. He could get an extension or they could ask him to leave at a moments notice or they could do nothing and he could be here the full 240 days.
He is staying with our next door neighbor. Only has a limited number of days in Little Rock as CalArk is an "over the road" trucking company, so it doesn't make sense to rent an apartment.
I asked about driving on the wrong side of the road and he commented that it really was not as big of a problem as he first thought. The only time he ever has a problem is when he makes a turn and no one is on the road. Says he has to really think when that accrues.
I hope he gets his visa extension as he is really a pleasure to be around. When I commented that he "talked funny", he replied that he was the only one he could understand.

Thursday, July 05, 2007

New Friend

I really did not want to work on the 4th, but being the "slave driver" that she is, my wife made to go.

The day started out great. Two blowouts in the first hour, costing a total of 3 hours. A larger than normal load to transfer in Texarkana topped it off.

Heading home, as I approached the rest area east of Texarkana, I noticed a big truck coming out to the interstate. I moved over to the left lane as not to hold him up or have to slow behind him.

As he moves off the entrance ramp into the right lane, he is picking up speed rather quickly (guess he was empty). I am now beside him and looking in my mirror to see when I clear his truck so I can move back to the right lane.

I notice a brown Chevy Malibu leaving the rest area at a high rate of speed. He tries to pass the other truck on the entrance ramp but does not make it, so he whips out behind him and then behind me as I am about to clear the truck. It takes a while for me to clear him and I move back in the right lane.

Mr. Chevy Malibu speeds up beside me and blows his horn. When I look over he waves in such a manner that he must think I am number "1". He then takes off like a flash.

As we get close to the Red River, we run into a heavy thunderstorm. So heavy that the interstate traffic slows to 40mph. It lasts for about 5 miles and we finally reach where it has already passed. As we pick up speed on the still wet road, we are again slowing to almost a crawl. I figure there must be a wreck ahead.

As we go over a little rise in the road. There is Mr. Chevy Malibu sitting in the median stuck up to his axles. I started to stop and exchange e-mail addresses with my new friend but when I see him standing in the mud almost up to his knees and talking on this cell phone, I decide not to disturb him and just tooted my horn and smiled as I slowly drove by.

He instantly recognized me and reaffirmed his admiration. I smiled even larger as I was "feeling the love".

Thursday, June 07, 2007

Deck-day 4

Today I wrapped up the deck by underpinning it.








Sometimes it is the little details that no one notices that make one job look a little nicer that the next one. You really can't see it in the photo but the two panels on the right have the outside boards on the lattice work running toward the center at the top and the two on the left do the same. This centers your vision on the middle of the deck.
















This photo shows the post I added under the deck to match it top post I had added to break the long span.








I wanted to be able to store stuff under the deck. I thought about putting hinges on the panels but I also wanted to remove the panels when I move the deck. Hinges would have to be unscrewed and that leads to sloppy screw holes. Plus 7 sets of hinges would add almost $75 to the project.

If you enlarge this picture you will see the "spikes" I used. They shove in flush but I pulled them out so you could see them. All 7 panels have 4 holes drilled and the spikes inserted. Holes were then drilled in the posts so the spikes can be a "slip" fit.








Remove the 2 top spikes and the panel can be tilted down.












Remove the 2 bottom spikes and the panel can be tilted up.











Remove all 4 spikes and the panel can be removed. At $.08 a spike the 7 panels cost $2.24 for "hinges" the fit my needs.

I am not telling you this is the way to build a deck but just showing you how I built mine.

I spent about 35 hours building the deck. Heck, that means it only cost about $20 an hour to have "all this fun".

Wednesday, June 06, 2007

Deck-day 3

Day 3 was another shorter day as we had company after I had worked a few hours. After visiting and relaxing, I just was too tired to resume working.


The day started with another trip to Home Depot for more 2x4's and balusters. After day 2 and working out how far apart I wanted the balusters. I knew how many more I needed.













I decided I didn't like the long span across the back and added a post to make it look a little more like the front.










I still had one more piece of 4x4 that I could use for the post from the decking to the hand rail. I could add two 2x4's screwed together for the post that goes from the deck to the ground when I underpin everything.


I cut the 2x4 under the hand rail, cut the post to fit, and screwed it in place. The bottom of the post is attached by screws from under the flooring so it does not look "added on". I added the balusters and that finished the back.













The small section by the front steps was next. It was pretty straight forward.












The balusters for the step hand rails were a different matter. I wanted the top cut at the same angle as the top rail and the bottom would be a compound angle. A 45 degree at the bottom like all the rest but also cut on the bias to match the top rail. Hard to see the compound angle from the picture but it turned out nice.


One more little detail and it would be finished except for the under pinning.












The transition from the top rail to the top rail on the steps needed a little attention. I could have tapered the top rail on the step but I didn't like that idea.












I cut a small wedge and screwed it in place and called the top " FINISHED".

Tuesday, June 05, 2007

Deck-day 2

Day 1 was Sunday of last week, I worked Monday, and day 2 was Tuesday. After Tuesday I have 4 long days in a row at work, so I felt I needed a little shorter day than I had put in on Sunday.


Even thou it looked like I am about finished with the deck, the rest will go slower because every board has to be measured to get a close fit.

I started with the 2x4's that go under the top railings. After all were cut and screwed in place, I added the top railings. At least now we would not fall off of the deck.









Next I cut the balusters boards at a 45 degree angle on bottom and installed them. I decided if I used a piece of 4x4, I would achieve the "right look" for them. Since there would be 9 balusters per section, it was just a matter of centering the first one (using my little centering trick) and using the 4x4 block to space the rest.


















The front 4 sections were all I had time for as I wanted to redo the steps.









This is what they looked like when I just threw them together on Sunday to get us by. I just used 2 sets of step stringers and had the steps overlapping the ends.









I moved the stringers out to the end of the steps and added a middle stringer. Lag screws run thru the stringers into the posts and are hidden under the steps. I installed the 2x4's and top railings. This made for very stable steps (don't you just hate handrails that are flimsy?).


I finished my day by putting the rest of the screws in the flooring. Seems like a lot less work, but it still took longer than I had hoped. Still I was very pleased for the work accomplished in 2 days.

Sunday, June 03, 2007

Deck-day 1



I picked up the truck and 16 ft. trailer and headed to Home Depot to buy enough lumber to start on the deck.


Home Depot now sells lumber pressure treated with Thompson's. The lumber is more of a natural color and does not have the "green tint" of the old pressure treated lumber.


I also picked up a new cordless drill as the one I have is old and only has one battery. When I opened the new drill, I received a surprise. It came with two batteries and I hadn't even noticed it when I purchased it.


It was about 10:30 am when I pulled into our driveway. I had been planning the deck for several months and I had a plan as to how it would be built.


Plan the job
Plan the work
Work the plan
Seems simple enough, doesn't it.

Since I only have Sunday and Tuesday off, I knew I would need to complete enough of the deck that we could use it. I hoped to complete the frame work, put up the posts, throw enough decking boards on top to walk (even if they were not nailed down)and I could use my pallets for the steps. A lot for one man to do in a day!

The basic frame work would be built on milk crates (just borrowed some from work as we all know it is illegal to possess them). I stacked them two high and had enough to do the job.

I first cut the 2x8x16 down to 15ft. 6in., this would let the 16ft. decking hang over the ends. The 7 2x8x12 were cut into 14 2x8x6's. By using those as floor joists on the inside of the stringers it would give a with of 6ft. 4in. Add to that the fact the decking would hang over front and back and I could achieve my 16x7 deck.

After the stringers and joists were cut, I clamped the stringers together and laid out for the posts and floor joists. I made a mark for the floor joists and put 2 x's where the posts would go. A joist would go on each end and then one on each side of the 4x4 posts. There would be five posts on the front and five posts on the back. As I only need handrails on three sides, some of the posts would not need to be above the floor.

I put a floor joist at each end, then a 4x4 post, another post would be in the middle, I would then "half" that distance and add another post for each "half". You can't just say they will be 4ft apart because they are not. In between each post and joist would be another joist. The line below shows how it was layed out. The "I" depicts each side of the floor joist and the "XX" depicts the 4x4 posts.

IIXXII II IIXXII II IIXXII II IIXXII II IIXXII

As you can see each 4x4 has a joist on each side to help keep it "plum". I layed out the lines and used a square to mark both tops of the stringers and then laid them flat and used the square to transfer the marks on the inside of each stringer.

Now I want to pass on a little tip I use for finding the center when I need to. Just divide by 2. Sure 58 divided by 2 equals 29, but what if the number is 127 and 11/16, not so easy to do in your head. Just use a number you are comfortable dividing by 2. How about 128. While your tape measure is still down just put a mark at 64 (128 divided by 2), now measure from the other end and put another mark at 64 from that end. The two marks are very close together. Now put a mark in the center of those two. You now have the center of 127 and 11/16. Measure from each end again to the mark you made in the middle of your two 64 marks. Makes no difference if the number you use is longer or shorter. If you use a number longer than the measurement as we just did, then the 64 inch marks will pass the center both ways. If you use a shorter number than the total length, then each mark will be shy of the middle by a little bit but the center of those two marks will still be the dead center. Sounds complicated but it is very simple and you can find the center faster than someone can do the division. I never bother to read the fractions on the first measurement, just round the inches up or down for quick division.

With the stringers and floor joists cut, I nailed the end joists, one joist for each side of the posts, and the joists that were between the posts. Just a simple rectangle with the joists inside. I just put 2 16 penny nails on each end for now. I measured diagonally across the two long sides and adjusted until the measurements were the same and I knew it was then square. Now I nailed two 2x4's diagonally across each end to keep it square. I then put screws in every joint ( I was thru using nails, everything would be screwed together).

Where I had my two X's for the posts, I drilled 5/16" holes for the lag screws I would use for the posts.

I then raised the frame to its final height. As the concrete pad is not level, I knew each post would be a different length. Two of the post that would hold the deck and come up to form the railings would be a little over 6 feet but some of the others would be a little under 6 feet, so I knew I needed to cut the over 6 ft. posts from the 12ft 4x4's and use the shorter than 6ft that was remaining for another post.

The wife helped with a pen and paper. I measured from the ground to the top of the stringer and had her add 39 1/2 inches ( the height of the railing). While she was adding I would grab a 12ft post to cut to the right size. I then put the post beside the floor joist and screwed in the lad screw. I put in the four corner posts first, then the middle posts, and finally the four other posts. I then put in the floor joists on the other side of the posts. I then checked it for "square" again and it was still fine. The frame was now suspended by the posts.

After "plumbing" the posts, screwed thru the stringers and thru the joists on either side of the post. They would now stay plumb.

Next I turned to the "decking". I notched out for the posts for the first board and screwed it in place. Time was running short and I knew I could not screw all the boarded down, but I wanted to "set" the gap on all of them before I quit. I used a 16 penny nail to set the gap between the decking boards. I drove the nail thru a block of scrap wood and placed it between the decking boards. I then placed a board beside the that first one and "set the gap" and put one screw at each floor joist (that would hold it until I had a chance to put in the rest of the screws). I managed to get all the decking down in that fashion.

I then built the steps so we could at least use them. They would be properly built another day.

9:00pm and I called it a day. It looks pretty nice for one days work for one "old" fellow.














Friday, June 01, 2007

Deck - The planning

We knew we wanted to add a deck for our travel trailer, since it is on the front I guess it is really a front porch. Our motorhome had two steps in side when you opened the door and two steps outside. I had placed two plastic pallets in front of the door as the little rv steps are hard to use.

The travel trailer has no steps inside and four steps outside. The first one being very high. I could had built nice wooden steps but the concrete slab we use for our front patio is level with the ground and every time it rains, mud and trash cover the concrete. The lot is sloped to the back and the concrete slab has two cracks across it. The slope means a deck would only only have 3 steps at the front and you can enter the TT from the deck without adding another step.

So a deck was in order. Our awning is 20 feet long and extends out about 8 feet, so a 16x7ft. deck would work fine. The new deck must meet several criteria.

1. It had to be free standing so it could be moved away from the travel trailer to make moving the TT in and out without hitting it easier. The TT sits just off the slab and the slab is 8 feet wide. The deck would set about 4 inches from the TT so the deck could be moved out a foot or so and still be on the slab.

2. The awning must cover the deck when extended.

3. Had to fit on a standard 16 ft. trailer as I plan to sell it in a couple of years when I retire and start traveling full time.

4. Needed to be sturdy, attractive, and built with the least amount of waste when cutting the lumber. Wasted lumber means wasted money.

5. No joints in the decking.

When drawing up the plans it worked out like this.

2 2x8x16 stringers
7 2x8x12 's could be cut to make 2x8x6 floor joists
6 4x4x12 would make all the posts
18 5/4x6x16 radiused decking, top rail, and steps
3 3-step stringers
4 sheets of 4x4 lattice to underpin (and enough for another project I have in mind).

This would make up the basic deck.

Since I had to borrow a pickup and trailer to haul the lumber. I wanted to pick up all the long lumber in one trip. The smaller lengths could be hauled in my s-10 pickup.

Tuesday, May 22, 2007

Computer Desk

I knew I wanted to custom build a computer desk for our new Cardinal travel trailer but I changed the design several times and this is what I finally built.










This is the picture of the unit that we used to order our trailer. Ours has hardwood flooring in the kitchen and living room but it shows where I wanted the computer desk. The desk would sit in front of the window and the recliner would be our computer chair.













I wanted the desk to match the kitchen cabinets so I ordered doors from the factory. I then changed my design after I realized if I put the printer behind doors and the CPU behind a door on the other side, then it would limit the width where my legs go under the table.












This is the final design I chose to built. I notched the back to clear the window treatment and put a back splash around it.























The desk has the CPU unit, DSL, and surge protector behind the door. The left end of the desk is open to let the CPU unit breath. The scanner printer and monitor on the desk. The keyboard and mouse is on a pull-out tray.










Ready to use, it seems to fit the bill.












The colors blend very well as the desk takes on a lighter or darker shade depending on the light. This shot shows the desk, kitchen cabinets and hardwoods floors.








Add the recliner and I am ready to update my blog and check on all the blogs I visit.


I usually use stain and top it with polyurethane but this time I tried the polyurethane with the stain already mixed in. The problem with it is if you get a run then the stain accumulates at the bottom of the run. On horizontal surfaces it is fine but on vertical panels it tends to run. I feel it is more of a spray application.

All-in-all I am very pleased with the desk and it is built with three-quarter inch oak plywood and one inch oak lumber so it is built to last.

Friday, February 09, 2007

Computer desk

I ordered 3 doors from the rv factory for the computer desk I plan to build. These will match the doors you see in the picture and were cheaper than buying doors locally that would not be a perfect match.












The doors came with hardware but when I opened the box, they had forgotten to include the handle escutcheons ( backing plate ). A call this morning and they are now on their way.
The desk will be taller than a normal desk as I want to place our printer in a drawer over a file cabinet drawer. That will require the desk top to be almost as tall as the counter top but I can place the keyboard and mouse on a pull out tray that will be lower. All in all I think I can make it look alright.
Can't say I am thrilled with the dealership but the factory parts department is just great .

Friday, February 02, 2007

My kind of gal

If you are not from Arkansas then you may not know that Arkansans can not survive 2 days without "milk and bread". Let the forecast call for a chance of ice or snow and you will find the grocery shelves empty of "milk and bread".

I am not joking. People that use one gallon of milk in a week will buy 2 or 3 gallons if a snow is forecast. We are not talking about a blizzard but a snow that will keep driving to a minimum."It might not be wise to drive today but tomorrow will be fine", type of snow.

Being in the milk business, things get crazy with a snow scare. We "hot shot" (a term we use for unscheduled deliveries) to all stores. I can always count on a few hot shots to Wal-Mart stores.

I had a hot shot to Malvern Wal-Mart and everyone in the receiving area was talking about the "starving without milk and bread" theory. The gal that is in charge of the back door spoke up and said, "To heck with "milk and bread", give me "pizza and beer".
 

Free Web Counters
South Beach Diet Food